- CLIENT:
- LOCATION:
- DURATION:
Scope of Work
Detailed demolition works to various areas around the site including Adelaide Casino, Railway Station, Adelaide Festival Theatre, and the Intercontinental Hotel, to make way for the new precinct and Sky City casino expansion. Works started with the removal of a large cable stayed foot bridge(40 + metres) which required detailed separation works and extensive engineered solutions to enable safe works.
Uniqueness
Most works required engineered methodologies established by Royal Park Salvage and third party engineers. Engineered protection was required to surrounding structures that needed to remain untouched. Three fully operational loading docks continued to operate whilst works took place. Scheduling works to minimise noise associated with the Intercontinental Hotel and events at the Adelaide Festival Theatre.
Recycling
All waste from the project was taken to Adelaide Resource Recovery to be recycled. 98% of all waste was recycled.